Thursday, July 12, 2007

In Leadership Remember, The Foundation Takes Time.

A lesson from my paseo to your office.

About two hebdomads ago, my father visited so that we could work on some place improvement
undertakings together. One of these undertakings was constructing a substitution wooden walkway
leading from the private road to the presence porch of my home. This undertaking appeared to be simple on the
surface, but as we began to take apart the existent construction we discovered that the undertaking would, in
fact, be much more than challenging.

The first measure was to take apart the existent walkway. This 29year-old construction had stood the
diagnostic test of time, but was now becoming unsafe. From old age of hard weather condition statuses and
changeless use, the paseo was icky in some countries and barely supported in others. Clearly,
former proprietors of our place had made efforts to mend the structure, but after clip the small
fixes could not conceal the larger challenge of a weakening support structure. At first the
deconstructionism was entertaining and fun. Later, however, came the realisation that we had our
work cut out for us.

As we ventured into breakage old boards, removing screws, nails and wood,
we realized that an entirely new support construction needed to be created. None of the existing
boards could be utilized in the new walking and we would necessitate to construct concrete foundations for
each critical support post. Now the merriment was over. We had some existent work to do.

Think for a minute about a undertaking or enterprise that demands rework to make a more than effective
result. On the surface, this too may look to be a very simple process that volition no doubt
bring on great change. Are the existent support strong adequate to simply construct on a new top
construction or will the full support demand to be rebuilt? Over the years, what have succumbed to the
pressure level of the rough elements surrounding your business? Often as leadership we look to old
constructions and thoughts and say, "This is the manner it have got always been." Had my father and I followed
that thinking, I would have a glistening new paseo built on a rotting foundation destined to
eventually collapse. I have got witnessed many of my clients attempting to construct new enterprises on
top of that same rotting foundation and the consequence is equally disastrous. The first step, then. to
preparing any of your ain company undertakings must begin with the possibility of edifice a new
foundation.

But Todd, this takes time!

Ah! Well there is the truth for certain. Believe me, I understand your situation. It took us more
clip to construct the unseen foundation of my paseo than it did to finish the portion you actually
see as you walk across. Time? What else make you have got but time? The clip you don't take now
will certainly endanger any undertaking additional down the road. How can you possibly construct
anything of permanent value without taking the clip to plan, garner information, designing the RIGHT
construction and then construct a powerful foundation? We did take that time, which created a consequence of
such as strong terms I have got advised my married woman to bind the house to the paseo in the event of a
hideous wind storm.

What is the quality of any undertaking you are working on right now? Are you certain that the
foundational excellence of that undertaking is stable? Rich Person you taken the clip to inquire tough questions
like, "How long volition this new paseo last?" or "Do I have got the right resources in the optimal
positions?" What haps in our modern concern environment is not unlike what started to
go on to us during construction. We began to experience fatigue as the twenty-four hours wore on. We started to
speak about cutting corners, using different stores that were not rectify and so on. Then we
stopped, took a measure back and decided that we must construct this the right manner now or hazard coming
back to it at another clip and disbursement more clip on the rework. Or even worse, jeopardizing
the success of my household as we utilize that paseo every day.

Sound familiar?

If you desire your adjacent enterprise to be successful and base the diagnostic test of time, then
you must inquire these same tough questions. The quality is not up to chance. Instead it is only the
consequence of your ability to stop, and then go on edifice the right foundation. So how make you beef up the foundation of your team? Try these first steps:

1) At the oncoming of every project, enlist the Use It doctrine and actually post these
guidelines somewhere for all to mention to frequently, as they are the edifice blocks to
success.

"Use It"

Understand the Big Picture

Say: My mental attitude orders my experience.

Evict your ego!

I presume nothing.

Take nil personally.

2) At that minute when you are about to give quality for speed, retrieve the story
I told you of that walkway. Your concern trusts on quality. Your unity trusts on
quality, and people regard people who stand up for the excellence that is possible.

3) Start with the right tools, stuffs and stores from the beginning. However, if you
don't cognize what you don't know, then make not be afraid to travel back to the shop and get
what you need. The paseo will back up you all the better for it.

Tuesday, June 12, 2007

The One Best Step to Mazimize Your Disaster Plan

There are as many ways to write an after action report as there are hospitals that are now required to perform disaster drills and write after action reports analyzing the performance of the institution following a disaster or a disaster exercise. Since there are 5,756 licensed hospitals in the United States, there are 5,756 different ways that are currently employed to write the after action review. At most institutions, after action reviews are written by a committee between 12 and 18 individuals, managers and supervisors who in addition to their regular duties, have been charged with analyzing the performance of their departments during an adverse event or disaster exercise.

When these individuals meet, they review the disaster plan and the performance of each division of the organization seeking to identify those areas where they enjoyed success. This list of successes will represent what the committee will keep as part of all future plans.

The committee will then review performance to determine where the plan failed. From this list of failures, they will perform a "root cause analysis" seeking to determine why the failure occurred at each of these critical locations. This list of failures, along with the list of root causes, will become the list of those items to be changed in the next plan.

In the last year, however, a new recommendation for a more effective after action review process has come to light. The recommendation does involve spending a small amount of money. The one best technique for maximizing your disaster plan is to buy index cards.

During a disaster or a disaster exercise, every individual involved in the operation of the hospital, regardless of their role or job, receives an index card. On the front of the index card, these employees will write the one thing that they saw that went extremely well during the disaster or disaster drill. On the back of the card, these employees will write the one key failure that they saw during the course of the disaster operation or disaster exercise.

Following the disaster or disaster drill, when it is time to perform the after action review the index cards will be collected and taken to the review committee. The hospital now has thousands of eyes that have critiqued hospital operations.

When the committee meets, they will perform their usual analysis of those things that went well and those areas of failure. They will still perform their usual root cause analysis attempting to identify the reasons for all failures. Then they will turn to the index cards.

If the committee is very, very lucky, on the front of the index cards, they will find that the employees saw the same successes as the committee identified. The committee now knows, with certainty, what items to keep as part of the disaster plan.

In review, those areas where the employees saw the plan fail; they will find that the committee's list of critical failures matches the observations of those who worked during the disaster or disaster drill. The committee now knows that their analysis is valid. They identified the same failures as the employees.

If the committee is very, very, very lucky, there will be one index card that identifies the early critical failure that started the domino-like cascade that ultimately led to the failure of the hospital's disaster plan. When the committee fixes this early failure, the hospital's disaster plan will be that much closer to a perfect plan.

Unfortunately, there are no absolutely perfect disaster plans. However, a "near perfect" plan can be achieved. The "near perfect" is that disaster plan that continues to function until one second after the last emergency room patient resulting from the disaster is moved from the emergency room gurney into a regular hospital bed. Because, if a plan can last until one second after the last emergency room patient resulting from that disaster leaves the emergency room, then the plan has lasted until recovery has begun.

Take this one best step and maximize your disaster plan.